San Dieguito Dam Concrete Refurbishment

Joint facilities project #1754

An inspection of the Dam conducted in Fiscal Year 2016 identified surface wear on the exterior face of the San Dieguito Dam that requires refurbishment. This project includes the design and construction work required to repair the concrete surface in the areas identified. Design was initiated in Fiscal Year 2017 and will be completed in Fiscal Year 2018. Construction will occur between Fiscal Year 2019 and Fiscal Year 2020.

Total Project Cost: $500,000