Advance Water Purification (Potable Reuse) Evaluations

District project # 1504


  
This project continues the feasibility of an Advanced Water Purification Project that has the potential to enhance the reliability of the District's water supply portfolio.  The project will evaluate potential advanced water treatment (AWT) requirements at the San Elijo Water Reclamation Facility; a new AWT pump station and force main (potentially constructed inside an existing abandoned 30-inch SDWD pipeline) to the San Dieguito Reservoir; and improvements to the San Dieguito Reservoir, San Dieguito Pump Station, and Raw Water Force Main to the R. E. Badger Water Filtration Plant. This is anticipated to be a joint project between the District, San Elijo Joint Powers Authority, and San Dieguito Water District.

The future operating impacts of this project will be determined as part of the planning and evaluation process.

Total Project Cost: $115,000